Installation site
,
Make sure the dryer door can be
opened without hindrance after
installation.
Transporting the machine to its
installation site
When moving the machine you can
hold it by the lid where it protrudes to
the rear of the dryer. To manoeuvre the
dryer out of its packing case to its
installation site you will also need to
hold it by the front feet.
Building under a continous worktop /
in a kitchen run
The space required by the vent duct
must be taken into consideration when
calculating the distance between the
machine and a wall or other machines
or furniture on either side.
,
A building under kit* is required
which must be fitted by a suitably
qualified person.
The machine lid is replaced by a
coverplate. It is essential that the
coverplate is fitted to ensure
electrical safety.
–
When installing under a 900/910 mm
high worktop a spacer kit* is
required.
–
Flat ducting* is required if there is not
enough space for a ventilation
ducting hoses or pipes.
–
The electrical socket must be
located in an accessible position
near the machine.
* Available as an optional accessory
from your Miele dealer or the Miele
Spare Parts Department.
The building under kit is supplied with
its own installation instructions.
N.B. When built under drying times may
be longer.
Replacing the lid
If the lid has been removed in order to
fit a cover plate, ensure that, if the lid is
replaced, it fits securely into the rear
holders. Otherwise, it is not properly
secure for transport.
Installation
25
Comments to this Manuals