Miele PW 6241 Operations Instructions Page 38

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 37
Plumbing
The machine should be connected to two water
supply faucets, which conform with local and national
regulations. Installation must be carried out by an
authorized service technician.
To ensure the machine is correctly connected please
follow the installation plan and the installation
instructions supplied with the machine.
Connecting the water intake / water drain
hoses
See the enclosed installation plan.
A water pressure flow rate of at least 14.5 psi, maximum
145 psi is required.
The inlet pressure hoses supplied with the machine
must be used for connection to the water supply.
The hoses should only be replaced with genuine
Miele spare parts which fulfill the pressure
requirements.
The hot water intake must not exceed a temperature
of 158°F (70°C).
Cold water connection only
See the enclosed installation diagram.
Installation Instructions
38
Page view 37
1 ... 37 38 39 40 41 42 43 44

Comments to this Manuals

No comments