Drilling diagram
To prepare a backing plate, the
spacings for the 5 mm screws need to
be drilled as shown.
* The dimension between the ceiling
and the middle bracket may vary
depending on the position of the vent
cut-out and the power socket. It should
be installed as low as possible.
If the ventilation hood will be mounted
directly to the wall, follow the additional
instructions given in the included
"Installation diagram".
Appliance dimensions
25
Comments to this Manuals