Miele G 7823 Operations Instructions Page 46

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 45
,
All electrical work must be
carried out by a suitably qualified
and competent person in
compliance with local and national
safety regulations.
^
Connection should be made via a
suitable isolator which complies with
local and national safety regulations
and the on-off switch should be
easily accessible for servicing.
WARNING
THIS APPLIANCE MUST
BE EARTHED
^ For technical data see the data plate
or wiring diagram supplied.
The machine must only be operated
with the voltage, frequency and fusing
shown on the data plate.
The data plate (with test certification
VDE, DVGW etc.) is located on the rear
of the machine and also behind the
plinth panel below the protective plastic
cover.
The wiring diagram is secured to the
inner side below the protective plastic
cover.
Removing the plinth panel and the
protective plastic cover:
,
Isolate the machine from the
power supply.
^ Holding the plinth panel at both
sides, pull gently outwards from
beneath a and take it out b.
^ To remove the protective plastic
cover unscrew the 2 screws (left and
right) c.
To reassemble:
^
Refit the protective plastic cover and
the plinth panel in the reverse order
to which they were removed.
See also the installation diagram
supplied.
Bonding connection
There is a screw connection point
marked with the earth symbol (8)atthe
back of the machine, to which the earth
bonding must be connected.
Electrical connection
46
Page view 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 52

Comments to this Manuals

No comments